Nearby alerts
Applies from Wed 17 Jan 2024, 3.42pm. Last reviewed: Sun 10 Nov 2024, 7.26pm
Closed areas: Closed areas due to flood damage
Slingsbys trail is closed until further notice due to severe flooding causing damage to infrastructure (bridge).
The western part of Syndicate walking track is closed from Tuesday 16 January 2024 until further notice. NPWS staff are working to assess the damage and repair options. The area will reopen when safe.
Penalties apply for non-compliance. For more information, contact the local area office on 02 6652 0900.
Affects 1 park and 1 location nearby. Show list
Applies from Tue 18 Jun 2024, 4.26pm to Fri 13 Dec 2024, 5.00pm. Last reviewed: Fri 8 Nov 2024, 8.54am
Closed areas: Warrick Road closed due to road works.
Warrick Road (to Mary's view) is closed due to road works.
Carrai Road is currently undergoing repair works but remains open.
For more information, contact the NPWS Walcha office on 02 6777 4700 or Port Macquarie office on 02 6588 5555.
Affects 1 park and 4 locations nearby. Show list
Applies from Mon 1 Jul 2024, 10.02am to Wed 30 Apr 2025, 11.59pm. Last reviewed: Thu 7 Nov 2024, 11.31am
Closed areas: Areas in Willi Willi national park closed for repair works
The following areas are closed for repair works until Friday 28 February 2025
- Wilson River picnic area
- Wilson River Bridge on Hastings Forest Way
- North Wilson Road
- Waterfall Walk
- Botanic Walk
Access to the Banda Banda Aboretum is open however extreme caution should be exercised. The trail becomes very slippery in damp or even misty weather and there is an increased risk of fallen trees blocking the trail. There are limited places to turn around safely if the trail is blocked. Visitors are encouraged to walk in to the Arboretum rather than drive.
Penalties apply for non-compliance. For more information, contact the local park office on 02 6588 5555.
Affects 1 park and 4 locations nearby. Show list
Applies from Sat 22 Jun 2024, 12.50pm to Fri 29 Nov 2024, 4.50pm. Last reviewed: Fri 25 Oct 2024, 12.53pm
Closed areas: Trial Bay Gaol closed
The Trial Bay Gaol will be closed to the public from Saturday 22nd June through until Saturday 30th November 2024 for maintenance works to the internal structure of the Historic building.
The Trial Bay Gaol and Campground office will be relocated to NPWS Arakoon Depot on Cardwell St, Arakoon.
All campers staying at the Trial Bay Gaol campground are to check in at the Arakoon Depot or phone the campground office on 02 6566 6168 between 9am - 4.30pm daily.
For further information on the Trial Bay Gaol closure or Trial Bay Gaol campground bookings please contact the Trial Bay Gaol office on 02 6566 6168 or email trialbay.gaol@environment.nsw.gov.au
Affects 1 park and 2 locations nearby. Show list
Applies from Fri 30 Jun 2023, 3.45pm to Fri 20 Dec 2024, 3.45pm. Last reviewed: Mon 21 Oct 2024, 3.25pm
Closed parks: Willi Willi Caves Nature Reserve closed due to unsafe access
Willi Willi Caves Nature Reserve is closed until further notice due to unsafe access to area.
Penalties apply for non-compliance. For more information, contact the local NPWS office on 02 6561 6700.
Affects 1 park nearby. Show list
Applies from Fri 30 Jun 2023, 1.23pm to Fri 20 Dec 2024, 1.23pm. Last reviewed: Mon 21 Oct 2024, 3.24pm
Closed parks: Yessabah Nature Reserve permanently closed
Access to Yessabah Nature Reserve is permanently closed to unauthorised personnel. The former quarry area has limestone rock faces that are unstable and prone to rock fall. Other areas of the reserve are geologically unstable.
Do not access this park. For further information call the NPWS Macleay area office on 02 6561 6700.
Affects 1 park nearby. Show list
Applies from Wed 16 Oct 2024, 4.02pm to Wed 30 Apr 2025, 4.03pm. Last reviewed: Wed 16 Oct 2024, 4.04pm
Closed areas: Temporary closure of Boambee Creek Bridge at southern end of Solitary Islands Coastal Walk
Please be aware that at the southern end of Solitary Islands Coastal Walk (SICW) there is temporary closure which impacts walker access between Boambee Beach and Boambee Headland.
The Boambee Creek Bridge footbridge will be closed until November 2024 (expected ARTC project finish date 30 Nov 2024).
Please be aware that Boambee Creek is several metres deep with a strong tidal flow to the ocean, so safe crossing requires using the bridge.
Alternatively, should you wish to pass during the closure window - please bypass Boambee Beach via town roads with adjacent concrete walking paths:
Southbound - from the Coffs Harbour Jetty - walk 1.6km west along Harbour Drive to Hogbin Dr roundabout, then 6.6km south down Hogbin Drive walking track to Sawtell Rd roundabout, then 1.3km east along Sawtell Road to Boambee Headland - continue south on SICW.
Northbound - from Boambee Headland - walk 1.3km west along Sawtell Road to Hogbin Dr roundabout, then 6.6km north along Hogbin Drive walking track to Harbour Dr roundabout and 1.6km east along Harbour Drive to the Coffs Harbour Jetty - continue north on SICW.
This project is outside of NSW National Parks and Wildlife Service managed lands, but this notice is to inform visitors that these works will affect the SICW walk route continuation further south of the Coffs Coast Regional Park.
Keep updated via City of Coffs Harbour project page information about the closure:
https://www.coffsharbour.nsw.gov.au/Your-Council/Projects-and-initiatives/Current-projects/Boambee-Creek-Bridge-Maintenance-and-Footbridge-Replacement
Applies from Tue 19 Mar 2024, 9.25pm. Last reviewed: Tue 5 Nov 2024, 9.18am
Closed areas: Ngambaa Feral Predator Free Area - Closed Roads
Construction is complete on the Ngambaa Feral Predator-Free Area which has necessitated the closure of roads in the reserve for visitor safety.
Cedar Park picnic area will remain open and available for visitor access.
The following roads are subject to permanent closure as part of the construction and operation of the feral predator free area:
- Wittigs Road
- parts of Stockyard Creek Road
- Seams Road
- Jacks Road
- Buds Crossing Road
Construction works were completed in August and the 23k of fencing is complete.
Construction works have included:
- clearing the fence corridor
- building the fence
- installing bridge and culvert crossings.
Information regarding the project can be obtained via the following link: https://www.environment.nsw.gov.au/topics/parks-reserves-and-protected-areas/park-management/return-of-threatened-and-declining-species/ngambaa-feral-predator-free-area
For further information please contact the NPWS Coffs Coast area office on 02 6652 0900
Affects 1 park nearby. Show list
Applies from Fri 23 Aug 2024, 3.37pm to Sat 30 Nov 2024, 3.38pm. Last reviewed: Wed 25 Sep 2024, 9.49am
Closed areas: Cardwell Street carpark upgrade
Cardwell Street carpark upgrade works are scheduled to start from Monday 30th September 2024 with expected completion by late November 2024.
There will be no parking available at the Cardwell Street day-use area during this time. Alternative car parking can be found at the font of the NPWS Arakoon depot or at Trial Bay Gaol Campground.
Alternative pedestrian access to the beach will remain open during most of the construction phase, however there may be occasional public access day closures.
There will be an increase in machinery and truck activity in the area during the hours 7:00am – 5:00pm Monday to Friday.
Safety is our top priority, so please exercise caution if accessing the area during this time.
This project is Stage 1 of the infrastructure improvement works at the Cardwell Street Precinct in line with the Macleay Coast Master Plan.
For further information about the Macleay Coast Destination Project, visit the NSW Government Environment and Heritage website.
If you have any questions or need further information, please contact NPWS Hastings Macleay at npws.hastingsmacleay@environment.nsw.gov.au or (02) 6561 6700.
Thank you for your understanding and cooperation as we work to improve our park facilities
Affects 1 park nearby. Show list
Applies from Tue 6 Aug 2024, 11.37am to Mon 31 Mar 2025, 11.38am. Last reviewed: Mon 19 Aug 2024, 7.46am
Other planned events: Notice of Fox Baiting Program
NSW National Parks and Wildlife Service (NPWS) is conducting an ongoing ground baiting program in Gaagal Wanggaan (South Beach) National Park, Moonee Beach Nature Reserve and Bongil Bongil National Park, from 10 August 2024 to 28 February 2025. The operation will use 1080 (sodium fluoroacetate) poison for the control of foxes. The program is designed to minimise fox impacts on wildlife, especially threatened species. Signs will be placed at the entry to the baiting area. Domestic pets are not permitted in NSW NPWS-managed lands. Pets and working dogs may be affected (1080 is lethal to cats and dogs) and should be restrained or muzzled in the vicinity and also must not enter the baiting location. In the event of accidental poisoning seek immediate veterinary assistance. Please contact the local Coffs Coast NPWS area office for more information on 02 6652 0900.
Affects 2 parks nearby. Show list
Applies from Fri 9 Aug 2024, 11.37am. Last reviewed: Tue 22 Oct 2024, 8.51am
Closed areas: Section of Cockerawombeeba Road Closed
A section of Cockerawombeeba Road is closed between North Plateau Road and Forbes River Road due to storm damage.
Cockerawombeeba Road is open between North Plateau Road (Plateau Beech Campground) and Hastings Forest Way.
Plateau Beech and Brushy Mountain Campgrounds are both open and are best accessed via Hastings Forest Way.
Penalties apply for non-compliance. For more information, contact the local NPWS office on (02)6588 5555.
Affects 1 park and 2 locations nearby. Show list
Applies from Fri 11 Nov 2022, 8.31pm. Last reviewed: Tue 12 Nov 2024, 12.50pm
Closed areas: Moonee Creek south bridge (Caravan park to Green Bluff access) closed
Moonee Creek (Sugar Mill Creek) Bridge is closed until further notice, due to damage from coastal erosion.
Please find Crown Lands bridge replacement project info at https://www.crownland.nsw.gov.au/whats-happening/projects/remediation-works-crown-land
The bridge crossing provides access:
- To Reflections Holiday Park
- From Moonee south to Coffs Coast Regional Park, Green Bluff and Sapphire North.
Reflections Holiday Parks have closed the bridge until further notice, due to an engineering assessment deeming the bridge unsafe for pedestrians.
If you are planning to do the Solitary Islands coastal walk please reroute:
- West along Moonee Beach Road to the south-west corner of the shopping centre
- South along new concrete path on eastern side of Pacific Highway
- South onto southern end of North Solitary Drive
- East onto North Sapphire Road to the beach access at Beachstone Cafe
Green Bluff is alternatively accessible from the south via Rutile trail, off Ivory Circuit in North Sapphire.
Reflections Holiday Parks Moonee manages this bridge and is contactable on 02 6653 6552.
Applies from Thu 1 Aug 2024, 6.00am to Sun 15 Dec 2024, 5.00pm. Last reviewed: Fri 25 Oct 2024, 12.46pm
Closed areas: Point Plomer campground closed for revitalisation works
Point Plomer campground will be closed for camping whilst major works are completed in the precinct from Thursday 1st August to Sunday 15th December 2024.
Campground bookings from December 2024 onwards will be available from the completion of the project. Dates to be announced as completion nears.
For more information on the works please visit the Point Plomer Precinct Revitilisation webpage. https://www.environment.nsw.gov.au/topics/parks-reserves-and-protected-areas/park-management/community-engagement/limeburners-creek-national-park-goolawah-national-park-goolawah-regional-park-plan-of-management/point-plomer-precinct-revitalisation
Affects 1 park and 2 locations nearby. Show list
Applies from Mon 24 Jul 2023, 2.39pm to Fri 24 Jul 2026, 2.39pm. Last reviewed: Mon 4 Nov 2024, 12.59pm
Closed areas: West End of New England National Park closed
West end of New England National Park between Kilprotay Road & Hickeys Creek Road permanently closed.
For more information contact the local NPWS office on 02 6561 6700.
Affects 1 park nearby. Show list
Applies from Thu 30 May 2024, 10.32am to Fri 29 Nov 2024, 4.30pm. Last reviewed: Fri 25 Oct 2024, 12.44pm
Closed areas: Trial Bay Gaol closed for internal works between 22nd June and 26th October 2024
The Trial Bay Gaol will be closed to the public from Saturday 22nd June through until Saturday 30th November 2024 for maintenance works to the internal structure of the Historic building.
The Trial Bay Gaol and Campground office will be relocated to NPWS Arakoon Depot on Cardwell St, Arakoon.
All campers staying at the Trial Bay Gaol campground are to check in at the Arakoon Depot or phone the campground office on 02 6566 6168 between 9am - 4.30pm daily.
For further information on the Trial Bay Gaol closure or Trial Bay Gaol campground bookings please contact the Trial Bay Gaol office on 02 6566 6168 or email trialbay.gaol@environment.nsw.gov.au
Affects 1 park and 2 locations nearby. Show list
Applies from Mon 1 Mar 2021, 11.38am. Last reviewed: Thu 18 Jul 2024, 8.26am
Closed areas: Area permanently closed - Mermaid Pools
Access to Mermaid Pools is permanently closed including for swimming. Sudden large swells and tides create major waves that wash over the rocks and pools.
Do not access this area. The severe conditions at this site have caused a number of significant injuries and deaths in the past.
Mermaid Pools have never been a designated visitor site due to the extreme nature of the surf and tides at this location. There is no approved public access walking track to Mermaid Pools.
For further information call the NPWS Verges Creek area office on 02 6561 6700.
Affects 1 park and 1 location nearby. Show list
Applies from Tue 25 Jul 2023, 7.14am. Last reviewed: Wed 13 Nov 2024, 8.34am
Closed areas: Landslip on Hanging Rock Road in State forest
Access to Kosekai Lookout is currently NOT possible via Hanging Rock Road due to a section of Hanging Rock Road being damaged during March 2021 flooding event. The damaged section of road is managed by Forestry Corporation. Access to the lookout is now only possible in 4WD vehicles from the south via Boat Harbour Road and then turning onto Kosekai Road
Affects 1 park and 1 location nearby. Show list
Applies from Mon 21 Mar 2022, 10.41am. Last reviewed: Wed 13 Nov 2024, 8.34am
Closed areas: Suttons road closed permanently due to storm damage road failure
Suttons road is closed to vehicle traffic following the second major pavement collapse in an area of highly dispersible soils. Alternate access is via Granite Pit or McMullens roads.
For further information please contact the NPWS Coffs Coast area office on 02 6652 0900.
Affects 1 park nearby. Show list